Reference Number NIA_NGET0089
Title Impact of HVDC Cable Operation on Telecommunication Lines
Status Completed
Energy Categories Other Power and Storage Technologies(Electricity transmission and distribution) 75%;
Other Cross-Cutting Technologies or Research(Environmental, social and economic impacts) 25%;
Research Types Applied Research and Development 100%
Science and Technology Fields ENGINEERING AND TECHNOLOGY (Electrical and Electronic Engineering) 100%
UKERC Cross Cutting Characterisation Not Cross-cutting 100%
Principal Investigator Project Contact
No email address given
National Grid Electricity Transmission
Award Type Network Innovation Allowance
Funding Source Ofgem
Start Date 01 April 2014
End Date 01 May 2015
Duration 13 months
Total Grant Value £35,000
Industrial Sectors Power
Region London
Programme Network Innovation Allowance
 
Investigators Principal Investigator Project Contact , National Grid Electricity Transmission (100.000%)
Web Site http://www.smarternetworks.org/project/NIA_NGET0089
Objectives The objective of this project is determine the exact nature of the problem for both LCC and VSC interconnectors, and the mitigation measures required. Review of specifications related to cable interference issues. Determination of the exact problem as related to LCC and VSC systems in their most common topography. Development of the parameters that need to be collected to completely investigate the problem. Discuss and review mitigation measures and the options available pre, during and post-construction. Development of a mechanism/process suitable for route selection. Discuss mathematical and computer modelling techniques and how these can be utilised & developed. Review measurement techniques and equipment suitable for measuring harmonic currents and induced current.
Abstract HVDC cables installed adjacent to telecommunication lines and other assets can sometimes induce voltages which affect the functionality of these assets. The problem manifests in the telecoms line as a high noise level, making effective communication impossible. The problem National Grid faces, is that HVDC transmission links are crucial to the operation of the future, low carbon, transmission network, and interactions with other utility assets should be taken into consideration when installing, or solutions for mitigation should be found. Research The method proposed for this work is a desk based study involving a review of current standards related to cable interference issues, development of parameters needed to be collected for the problem to be investigated completely, discuss and review mitigation measures available pre, during and post construction and mathematical & computer modelling of the situations.Note : Project Documents may be available via the ENA Smarter Networks Portal using the Website link above
Publications (none)
Final Report (none)
Added to Database 20/08/18